ServicesPower CutsHelp

Electric Vehicle notification form

0800 029 4280

Notification of installation of dedicated electric vehicle charging equipment



Date of installation:*

Address of installation
House number:*

Street:*

Town:*

County:*

Postcode:*

What is the 21-digit Meter Point Administration Number (MPAN) for the meter to which the electric vehicle charging equipment is connected?*

Need help finding out the MPAN? Enter details here


Has an adequacy of supply check been completed?*
The IET Code of Practice highlights the installer’s responsibility to assess the adequacy of the supply capacity for the new electric vehicle load plus any existing load, before installation of the charging equipment, and assess the adequacy of the earthing, before installation of the charging equipment.

YesNo


What is the Property's Service Cut Out Rating?*

What is the rating of the charge point being installed?*

What is the maximum demand from all electric vehicle charging equipment installed at the property including any previously installed charging equipment that is available for use or where multiple charge points have been installed?*

What are the final earthing arrangements that have been applied for the installation of the charging point as per BS 7671 e.g. protective multiple earthing (PME)*

Type of installation

Is the property on a looped service?*

Has the DNO been contacted prior to installation? e.g.new connection, addition to supply capacity, assessment of network impact?*

If yes, give DNO reference if possible:

Charging point owner

Name:*

Telephone number:*

Email address:*

Is their address different from the installation address?:*


House number:*

Street:*

Town:*

County:*

Postcode:*

Installer contact details

Name:*

Company name:*

Telephone number:*

Email address:*

* Mandatory field