Flexible distributed generation connections

There are parts of the UK Power Networks distribution network where due to constraints such as capacity, voltage or reverse power flow issues the cost of connection is very likely to be higher than expected due to additional reinforcement works being required. A flexible connection will provide a connection within the existing network without the need for reinforcement. The customer must be willing to accept temporary reduction to their export to ensure the network is kept within operational limits and the constraint is not breached.