MPAN only - (Meter Point Administration Number)
We can help guide you through the process of requesting and applying for an MPAN depending on your needs.
What is an MPAN?
A Meter Point Administration Number, also known as an MPAN, is a unique 13-digit number that identifies electricity supply points across the UK. These numbers are used by suppliers as reference points for getting meters installed. If you live in London, the South East or the East of England then we can help you to find your MPAN.
It's important to note that if you are paying us to install a new connection, we will automatically provide you with an MPAN.
A qualified electrician must verify that the existing supply can handle additional electrical load before requesting an import MPAN.

What is an MPAN?
A Meter Point Administration Number, also known as an MPAN, is a unique 13-digit number that identifies electricity supply points across the UK. These numbers are used by suppliers as reference points for getting meters installed. If you live in London, the South East or the East of England then we can help you to find your MPAN.
It's important to note that if you are paying us to install a new connection, we will automatically provide you with an MPAN.
A qualified electrician must verify that the existing supply can handle additional electrical load before requesting an import MPAN.
Let's get started.
What type of connection do you need?
We've listed some of the common types of connections below that are requested by our customers.

Let's get started.
What type of connection do you need?
We've listed some of the common types of connections below that are requested by our customers.
I need 1 to 4 MPANs
-
Already have power
-
Are not increasing the overall demand - (this is the amount of power required for everything electrical connected to the property to work)
-
Need up to a maximum of four additional meters.
I need 1 to 4 MPANs
-
Already have power
-
Are not increasing the overall demand - (this is the amount of power required for everything electrical connected to the property to work)
-
Need up to a maximum of four additional meters.
I need 5 or more MPANs
-
Already have power
-
Are not increasing the overall demand - (this is the amount of power required for everything electrical connected to the property to work)
-
Need five or more additional meters.
I need 5 or more MPANs
-
Already have power
-
Are not increasing the overall demand - (this is the amount of power required for everything electrical connected to the property to work)
-
Need five or more additional meters.
Before you apply
Here’s a handy checklist of what you’ll need to include with your application to avoid any delays:
- Photos of:
- The main incoming electricity service (cut-out)
- The existing meters (serial numbers must be visible)
- The opened distribution board (if on a BNO network)
- Brief description of what the MPAN(s) will supply
- Confirmation from your electrician / electrical contractor that there is no change to the existing demand or provide a load breakdown in kVA for the total demand confirming the existing supply is sufficient (including both existing and new demand)
- Proof of official addressing (street naming and numbering from local council)
- If you are creating a House of Multiple Occupancy (HMO), please provide a copy of your licence obtained by your local authority
- Letter of Authority or recent bill / document showing your relation to the property.
Before you apply
Here’s a handy checklist of what you’ll need to include with your application to avoid any delays:
- Photos of:
- The main incoming electricity service (cut-out)
- The existing meters (serial numbers must be visible)
- The opened distribution board (if on a BNO network)
- Brief description of what the MPAN(s) will supply
- Confirmation from your electrician / electrical contractor that there is no change to the existing demand or provide a load breakdown in kVA for the total demand confirming the existing supply is sufficient (including both existing and new demand)
- Proof of official addressing (street naming and numbering from local council)
- If you are creating a House of Multiple Occupancy (HMO), please provide a copy of your licence obtained by your local authority
- Letter of Authority or recent bill / document showing your relation to the property.
Apply for 1 to 4 MPANs
Got all of the above information to hand? If so, you're good to go! Apply by email below.
We aim to reply within 10 working days.
Export MPANs
Export MPANs
Before you apply for an Export MPAN
Here’s a handy checklist of what you’ll need to include with your application to avoid any delays:
- Dated copy of the certificate from your installer
- Copy of the sales invoice confirming the size and date of the installation
- Photos of:
- The control equipment
- Your electricity meter and the the fuse holder which is at the end of the power cable coming into your property.
Before you apply for an Export MPAN
Here’s a handy checklist of what you’ll need to include with your application to avoid any delays:
- Dated copy of the certificate from your installer
- Copy of the sales invoice confirming the size and date of the installation
- Photos of:
- The control equipment
- Your electricity meter and the the fuse holder which is at the end of the power cable coming into your property.