Point of connection (POC)
This is the right place if you are an independent Connections Provider (ICP) / Independent Distribution Network Operator (IDNO) and need to make an application for a point of connection (POC) or to notify us that you will be self-determining a POC.
Our prices
Our prices are guided by our statement of Basis and Methodology of Charges for Connection to the Electricity Distribution System. Read more.
How long will the work take?
We aim to complete work as quickly as possible and we have timescales that we have to comply with as per our licence condition 15 (SLC15). In addition, we also voluntarily make penalty payments should we fail to provide any SLC15 standard within the prescribed time scales. Find out more.
Our prices are guided by our statement of Basis and Methodology of Charges for Connection to the Electricity Distribution System. Read more.
How long will the work take?
We aim to complete work as quickly as possible and we have timescales that we have to comply with as per our licence condition 15 (SLC15). In addition, we also voluntarily make penalty payments should we fail to provide any SLC15 standard within the prescribed time scales. Find out more.
Do you want to self-determine a point of connection?
In some circumstances an ICP can self-determine their own point of connection. Read more.
In some circumstances an ICP can self-determine their own point of connection. Read more.
What's involved
1
Please complete an application form and we’ll call you back
2
We'll start designing your project
3
We'll send you a price for you to pay
4
You'll need to send us your design for assessment
5
We’ll work with you to deliver the work
Ready to go ahead?
If you're all set and ready to proceed with the work, the next step is to use our Connections Application Portal to complete an application.
Or download our PDF form