Back

Live power cut list

MobileList Type Affected postcodes Time reported Estimated time for power to be restored Reason Customers currently affected Reference HiddenStatus
Status

Restored power cut

Affected postcodes

AL6 9

Time reported

19 Feb 2018 11: 55

Estimated time for power to be restored

within 8 hours of it being reported to us.

Reason

We had to turn off power in your area so our engineers could safely carry out emergency repairs to the network.

Customers affected

-

Reference

INCD-1190875-A View on map

Restored power cut
AL6 9 19 Feb 2018 11: 55 within 8 hours of it being reported to us. We had to turn off power in your area so our engineers could safely carry out emergency repairs to the network. - INCD-1190875-A View on map TypeID_restored
Status

Restored power cut

Affected postcodes

AL6 9

Time reported

14 Feb 2018 18: 31

Estimated time for power to be restored

within 8 hours of it being reported to us.

Reason

A fault occurred on an underground electricity cable affecting the local area.

Customers affected

-

Reference

INCD-1189928-A View on map

Restored power cut
AL6 9 14 Feb 2018 18: 31 within 8 hours of it being reported to us. A fault occurred on an underground electricity cable affecting the local area. - INCD-1189928-A View on map TypeID_restored
Status

Power cut

Affected postcodes

BN25 1

Time reported

19 Feb 2018 06: 56

Estimated time for power to be restored

19 Feb 2018 between 13:30 and 14:30

Reason

A fault occurred on an underground electricity cable affecting the local area.

Customers affected

-

Reference

INCD-133130-G View on map

Power cut
BN25 1 19 Feb 2018 06: 56 19 Feb 2018 between 13:30 and 14:30 A fault occurred on an underground electricity cable affecting the local area. - INCD-133130-G View on map TypeID_unplanned_power_cuts
Status

Power cut

Affected postcodes

CB6 2, CB6 3, CB7 5

Time reported

19 Feb 2018 12: 47

Estimated time for power to be restored

19 Feb 2018 between 14:30 and 15:30

Reason

We were investigating a high voltage overhead electricity line fault which caused a power cut in the local area.

Customers affected

110

Reference

INCD-1190890-A View on map

Power cut
CB6 2, CB6 3, CB7 5 19 Feb 2018 12: 47 19 Feb 2018 between 14:30 and 15:30 We were investigating a high voltage overhead electricity line fault which caused a power cut in the local area. 110 INCD-1190890-A View on map TypeID_unplanned_power_cuts
Status

Power cut

Affected postcodes

CM16 7

Time reported

08 Feb 2018 13: 07

Estimated time for power to be restored

19 Feb 2018 between 16:00 and 17:00

Reason

A fault occurred on an underground electricity cable affecting the local area.

Customers affected

-

Reference

INCD-19500-C View on map

Power cut
CM16 7 08 Feb 2018 13: 07 19 Feb 2018 between 16:00 and 17:00 A fault occurred on an underground electricity cable affecting the local area. - INCD-19500-C View on map TypeID_unplanned_power_cuts
Status

Power cut

Affected postcodes

CM23 3

Time reported

17 Feb 2018 11: 32

Estimated time for power to be restored

within 8 hours of it being reported to us.

Reason

We were investigating an electricity cable that was damaged, causing a power cut in the local area.

Customers affected

1

Reference

INCD-1190615-A View on map

Power cut
CM23 3 17 Feb 2018 11: 32 within 8 hours of it being reported to us. We were investigating an electricity cable that was damaged, causing a power cut in the local area. 1 INCD-1190615-A View on map TypeID_unplanned_power_cuts
Status

Restored power cut

Affected postcodes

CO3 3

Time reported

13 Feb 2018 10: 12

Estimated time for power to be restored

within 8 hours of it being reported to us.

Reason

A fault occurred on a piece of our electrical equipment which controls the power to your home.

Customers affected

-

Reference

INCD-1189424-A View on map

Restored power cut
CO3 3 13 Feb 2018 10: 12 within 8 hours of it being reported to us. A fault occurred on a piece of our electrical equipment which controls the power to your home. - INCD-1189424-A View on map TypeID_restored
Status

Power cut

Affected postcodes

CT4 5, CT4 6

Time reported

19 Feb 2018 09: 58

Estimated time for power to be restored

19 Feb 2018 between 14:30 and 15:30

Reason

We were investigating a high voltage overhead electricity line fault which caused a power cut in the local area.

Customers affected

10

Reference

INCD-133155-G View on map

Power cut
CT4 5, CT4 6 19 Feb 2018 09: 58 19 Feb 2018 between 14:30 and 15:30 We were investigating a high voltage overhead electricity line fault which caused a power cut in the local area. 10 INCD-133155-G View on map TypeID_unplanned_power_cuts
Status

Restored power cut

Affected postcodes

DA11 9, GU2 7, GU3 1, GU3 2, GU3 3, GU4 7, SE19 2, TN23 1, TN31 7

Time reported

19 Feb 2018 02: 27

Estimated time for power to be restored

19 Feb 2018 between 06:00 and 07:00

Reason

An underground electricity cable faulted on our high voltage network, causing an area wide power cut.

Customers affected

-

Reference

INCD-133125-G View on map

Restored power cut
DA11 9, GU2 7, GU3 1, GU3 2, GU3 3, GU4 7, SE19 2, TN23 1, TN31 7 19 Feb 2018 02: 27 19 Feb 2018 between 06:00 and 07:00 An underground electricity cable faulted on our high voltage network, causing an area wide power cut. - INCD-133125-G View on map TypeID_restored
Status

Restored power cut

Affected postcodes

DA7 4

Time reported

19 Feb 2018 10: 33

Estimated time for power to be restored

19 Feb 2018 between 12:30 and 13:30

Reason

A fault occurred on a piece of our electrical equipment which controls the power to your home.

Customers affected

-

Reference

INCD-43755-N View on map

Restored power cut
DA7 4 19 Feb 2018 10: 33 19 Feb 2018 between 12:30 and 13:30 A fault occurred on a piece of our electrical equipment which controls the power to your home. - INCD-43755-N View on map TypeID_restored
Status

Restored power cut

Affected postcodes

E2 0

Time reported

18 Feb 2018 23: 47

Estimated time for power to be restored

within 8 hours of it being reported to us.

Reason

A fault occurred on a piece of our electrical equipment which controls the power to your home.

Customers affected

-

Reference

INCD-188985-J View on map

Restored power cut
E2 0 18 Feb 2018 23: 47 within 8 hours of it being reported to us. A fault occurred on a piece of our electrical equipment which controls the power to your home. - INCD-188985-J View on map TypeID_restored
Status

Power cut

Affected postcodes

EC2V 7, EC2Y 5

Time reported

19 Feb 2018 08: 48

Estimated time for power to be restored

within 8 hours of it being reported to us.

Reason

A fault occurred on an underground electricity cable affecting the local area.

Customers affected

-

Reference

INCD-43737-N View on map

Power cut
EC2V 7, EC2Y 5 19 Feb 2018 08: 48 within 8 hours of it being reported to us. A fault occurred on an underground electricity cable affecting the local area. - INCD-43737-N View on map TypeID_unplanned_power_cuts
Status

Restored power cut

Affected postcodes

GU22 0

Time reported

17 Feb 2018 07: 55

Estimated time for power to be restored

17 Feb 2018 between 15:30 and 16:30

Reason

A fault occurred on an underground electricity cable affecting the local area.

Customers affected

-

Reference

INCD-133015-G View on map

Restored power cut
GU22 0 17 Feb 2018 07: 55 17 Feb 2018 between 15:30 and 16:30 A fault occurred on an underground electricity cable affecting the local area. - INCD-133015-G View on map TypeID_restored
Status

Power cut

Affected postcodes

HA6 1

Time reported

17 Feb 2018 16: 53

Estimated time for power to be restored

within 8 hours of it being reported to us.

Reason

A fault occurred on an underground electricity cable affecting the local area.

Customers affected

1

Reference

INCD-1190661-A View on map

Power cut
HA6 1 17 Feb 2018 16: 53 within 8 hours of it being reported to us. A fault occurred on an underground electricity cable affecting the local area. 1 INCD-1190661-A View on map TypeID_unplanned_power_cuts
Status

Restored power cut

Affected postcodes

IG8 9

Time reported

18 Feb 2018 22: 46

Estimated time for power to be restored

19 Feb 2018 between 03:30 and 04:30

Reason

A fault occurred on a piece of our electrical equipment which controls the power to your home.

Customers affected

-

Reference

INCD-188983-J View on map

Restored power cut
IG8 9 18 Feb 2018 22: 46 19 Feb 2018 between 03:30 and 04:30 A fault occurred on a piece of our electrical equipment which controls the power to your home. - INCD-188983-J View on map TypeID_restored
Status

Restored power cut

Affected postcodes

IP14 6

Time reported

19 Feb 2018 03: 57

Estimated time for power to be restored

19 Feb 2018 between 06:30 and 07:30

Reason

We were investigating an overhead electricity line fault which caused a power cut in the local area.

Customers affected

-

Reference

INCD-1190768-A View on map

Restored power cut
IP14 6 19 Feb 2018 03: 57 19 Feb 2018 between 06:30 and 07:30 We were investigating an overhead electricity line fault which caused a power cut in the local area. - INCD-1190768-A View on map TypeID_restored
Status

Restored power cut

Affected postcodes

IP16 4

Time reported

19 Feb 2018 06: 01

Estimated time for power to be restored

19 Feb 2018 between 08:30 and 09:30

Reason

A fault occurred on a piece of our electrical equipment which controls the power to your home.

Customers affected

-

Reference

INCD-1190774-A View on map

Restored power cut
IP16 4 19 Feb 2018 06: 01 19 Feb 2018 between 08:30 and 09:30 A fault occurred on a piece of our electrical equipment which controls the power to your home. - INCD-1190774-A View on map TypeID_restored
Status

Power cut

Affected postcodes

IP2 9

Time reported

19 Feb 2018 11: 55

Estimated time for power to be restored

19 Feb 2018 between 14:30 and 15:30

Reason

We had to turn off power in your area so our engineers could safely carry out emergency repairs to the network.

Customers affected

4

Reference

INCD-1190865-A View on map

Power cut
IP2 9 19 Feb 2018 11: 55 19 Feb 2018 between 14:30 and 15:30 We had to turn off power in your area so our engineers could safely carry out emergency repairs to the network. 4 INCD-1190865-A View on map TypeID_unplanned_power_cuts
Status

Power cut

Affected postcodes

IP9 1, IP9 2

Time reported

19 Feb 2018 13: 16

Estimated time for power to be restored

within 8 hours of it being reported to us.

Reason

We were investigating a high voltage overhead electricity line fault which caused a power cut in the local area.

Customers affected

-

Reference

INCD-1190900-A View on map

Power cut
IP9 1, IP9 2 19 Feb 2018 13: 16 within 8 hours of it being reported to us. We were investigating a high voltage overhead electricity line fault which caused a power cut in the local area. - INCD-1190900-A View on map TypeID_unplanned_power_cuts
Status

Restored power cut

Affected postcodes

KT1 1, KT1 2

Time reported

19 Feb 2018 09: 07

Estimated time for power to be restored

19 Feb 2018 between 12:30 and 13:30

Reason

A fault occurred on a piece of our electrical equipment which controls the power to your home.

Customers affected

-

Reference

INCD-133136-G View on map

Restored power cut
KT1 1, KT1 2 19 Feb 2018 09: 07 19 Feb 2018 between 12:30 and 13:30 A fault occurred on a piece of our electrical equipment which controls the power to your home. - INCD-133136-G View on map TypeID_restored
Status

Power cut

Affected postcodes

LU7 1, LU7 7

Time reported

19 Feb 2018 11: 34

Estimated time for power to be restored

19 Feb 2018 between 13:30 and 14:30

Reason

We had to turn off power in your area so our engineers could safely carry out emergency repairs to the network.

Customers affected

89

Reference

INCD-1190790-A View on map

Power cut
LU7 1, LU7 7 19 Feb 2018 11: 34 19 Feb 2018 between 13:30 and 14:30 We had to turn off power in your area so our engineers could safely carry out emergency repairs to the network. 89 INCD-1190790-A View on map TypeID_unplanned_power_cuts
Status

Power cut

Affected postcodes

ME10 3

Time reported

14 Feb 2018 21: 37

Estimated time for power to be restored

within 8 hours of it being reported to us.

Reason

Due to a faulty piece of network equipment we had to turn off your power.

Customers affected

1

Reference

INCD-132727-G View on map

Power cut
ME10 3 14 Feb 2018 21: 37 within 8 hours of it being reported to us. Due to a faulty piece of network equipment we had to turn off your power. 1 INCD-132727-G View on map TypeID_unplanned_power_cuts
Status

Restored power cut

Affected postcodes

ME14 4

Time reported

29 Jan 2018 14: 05

Estimated time for power to be restored

within 8 hours of it being reported to us.

Reason

We had to turn off power in your area so our engineers could safely carry out emergency repairs to the network.

Customers affected

-

Reference

INCD-130676-G View on map

Restored power cut
ME14 4 29 Jan 2018 14: 05 within 8 hours of it being reported to us. We had to turn off power in your area so our engineers could safely carry out emergency repairs to the network. - INCD-130676-G View on map TypeID_restored
Status

Restored power cut

Affected postcodes

ME7 5

Time reported

19 Feb 2018 05: 36

Estimated time for power to be restored

19 Feb 2018 between 10:00 and 11:00

Reason

A fault occurred on a piece of our electrical equipment which controls the power to your home.

Customers affected

-

Reference

INCD-133128-G View on map

Restored power cut
ME7 5 19 Feb 2018 05: 36 19 Feb 2018 between 10:00 and 11:00 A fault occurred on a piece of our electrical equipment which controls the power to your home. - INCD-133128-G View on map TypeID_restored
Status

Restored power cut

Affected postcodes

MK41 9

Time reported

19 Feb 2018 07: 00

Estimated time for power to be restored

19 Feb 2018 between 08:30 and 09:30

Reason

A fault occurred on a piece of our electrical equipment which controls the power to your home.

Customers affected

-

Reference

INCD-1190778-A View on map

Restored power cut
MK41 9 19 Feb 2018 07: 00 19 Feb 2018 between 08:30 and 09:30 A fault occurred on a piece of our electrical equipment which controls the power to your home. - INCD-1190778-A View on map TypeID_restored
Status

Restored power cut

Affected postcodes

MK43 7

Time reported

19 Feb 2018 09: 12

Estimated time for power to be restored

within 8 hours of it being reported to us.

Reason

A fault occurred on a piece of our electrical equipment which controls the power to your home.

Customers affected

-

Reference

INCD-1190800-A View on map

Restored power cut
MK43 7 19 Feb 2018 09: 12 within 8 hours of it being reported to us. A fault occurred on a piece of our electrical equipment which controls the power to your home. - INCD-1190800-A View on map TypeID_restored
Status

Restored power cut

Affected postcodes

N13 6

Time reported

19 Feb 2018 10: 42

Estimated time for power to be restored

19 Feb 2018 between 11:30 and 12:30

Reason

Due to a faulty piece of network equipment we had to turn off your power.

Customers affected

-

Reference

INCD-1190835-A View on map

Restored power cut
N13 6 19 Feb 2018 10: 42 19 Feb 2018 between 11:30 and 12:30 Due to a faulty piece of network equipment we had to turn off your power. - INCD-1190835-A View on map TypeID_restored
Status

Restored power cut

Affected postcodes

NR32 2

Time reported

19 Feb 2018 05: 05

Estimated time for power to be restored

19 Feb 2018 between 07:00 and 08:00

Reason

A fault occurred on a piece of our electrical equipment which controls the power to your home.

Customers affected

-

Reference

INCD-1190773-A View on map

Restored power cut
NR32 2 19 Feb 2018 05: 05 19 Feb 2018 between 07:00 and 08:00 A fault occurred on a piece of our electrical equipment which controls the power to your home. - INCD-1190773-A View on map TypeID_restored
Status

Restored power cut

Affected postcodes

PE1 3, PE4 6

Time reported

19 Feb 2018 06: 37

Estimated time for power to be restored

19 Feb 2018 between 09:00 and 10:00

Reason

An underground electricity cable faulted on our high voltage network, causing an area wide power cut.

Customers affected

-

Reference

INCD-1190777-A View on map

Restored power cut
PE1 3, PE4 6 19 Feb 2018 06: 37 19 Feb 2018 between 09:00 and 10:00 An underground electricity cable faulted on our high voltage network, causing an area wide power cut. - INCD-1190777-A View on map TypeID_restored
Status

Restored power cut

Affected postcodes

PE31 8, PE33 0, PE33 O, PE34 4

Time reported

18 Feb 2018 16: 39

Estimated time for power to be restored

within 8 hours of it being reported to us.

Reason

We were investigating a high voltage overhead electricity line fault which caused a power cut in the local area.

Customers affected

3

Reference

INCD-1190740-A View on map

Restored power cut
PE31 8, PE33 0, PE33 O, PE34 4 18 Feb 2018 16: 39 within 8 hours of it being reported to us. We were investigating a high voltage overhead electricity line fault which caused a power cut in the local area. 3 INCD-1190740-A View on map TypeID_restored
Status

Restored power cut

Affected postcodes

PE33 9

Time reported

23 Jan 2018 14: 07

Estimated time for power to be restored

within 8 hours of it being reported to us.

Reason

A fault occurred on a piece of our electrical equipment which controls the power to your home.

Customers affected

-

Reference

INCD-1190795-A View on map

Restored power cut
PE33 9 23 Jan 2018 14: 07 within 8 hours of it being reported to us. A fault occurred on a piece of our electrical equipment which controls the power to your home. - INCD-1190795-A View on map TypeID_restored
Status

Restored power cut

Affected postcodes

PE4 7

Time reported

19 Feb 2018 11: 16

Estimated time for power to be restored

19 Feb 2018 between 11:30 and 12:30

Reason

A fault occurred on an underground electricity cable affecting the local area.

Customers affected

-

Reference

INCD-1159369-A View on map

Restored power cut
PE4 7 19 Feb 2018 11: 16 19 Feb 2018 between 11:30 and 12:30 A fault occurred on an underground electricity cable affecting the local area. - INCD-1159369-A View on map TypeID_restored
Status

Power cut

Affected postcodes

RM11 3

Time reported

15 Feb 2018 12: 15

Estimated time for power to be restored

within 8 hours of it being reported to us.

Reason

Due to a faulty piece of network equipment we had to turn off your power.

Customers affected

1

Reference

INCD-1190061-A View on map

Power cut
RM11 3 15 Feb 2018 12: 15 within 8 hours of it being reported to us. Due to a faulty piece of network equipment we had to turn off your power. 1 INCD-1190061-A View on map TypeID_unplanned_power_cuts
Status

Restored power cut

Affected postcodes

RM13 9, RM14 2

Time reported

19 Feb 2018 13: 13

Estimated time for power to be restored

19 Feb 2018 between 14:00 and 15:00

Reason

We had to turn off power in your area so our engineers could safely carry out emergency repairs to the network.

Customers affected

-

Reference

INCD-19709-C View on map

Restored power cut
RM13 9, RM14 2 19 Feb 2018 13: 13 19 Feb 2018 between 14:00 and 15:00 We had to turn off power in your area so our engineers could safely carry out emergency repairs to the network. - INCD-19709-C View on map TypeID_restored
Status

Restored power cut

Affected postcodes

RM14 2

Time reported

16 Feb 2018 21: 17

Estimated time for power to be restored

within 8 hours of it being reported to us.

Reason

We were investigating a high voltage overhead electricity line fault which has caused a power cut in the local area.

Customers affected

-

Reference

INCD-19688-C View on map

Restored power cut
RM14 2 16 Feb 2018 21: 17 within 8 hours of it being reported to us. We were investigating a high voltage overhead electricity line fault which has caused a power cut in the local area. - INCD-19688-C View on map TypeID_restored
Status

Restored power cut

Affected postcodes

SE14 6, SE4 1, SE8 4

Time reported

18 Feb 2018 22: 25

Estimated time for power to be restored

within 8 hours of it being reported to us.

Reason

A fault occurred on a piece of our electrical equipment which controls the power to your home.

Customers affected

-

Reference

INCD-43736-N View on map

Restored power cut
SE14 6, SE4 1, SE8 4 18 Feb 2018 22: 25 within 8 hours of it being reported to us. A fault occurred on a piece of our electrical equipment which controls the power to your home. - INCD-43736-N View on map TypeID_restored
Status

Restored power cut

Affected postcodes

SE6 4

Time reported

18 Feb 2018 16: 51

Estimated time for power to be restored

19 Feb 2018 between 02:30 and 03:30

Reason

A fault occurred on an underground electricity cable affecting the local area.

Customers affected

-

Reference

INCD-43718-N View on map

Restored power cut
SE6 4 18 Feb 2018 16: 51 19 Feb 2018 between 02:30 and 03:30 A fault occurred on an underground electricity cable affecting the local area. - INCD-43718-N View on map TypeID_restored
Status

Restored power cut

Affected postcodes

SE8 4

Time reported

18 Feb 2018 22: 33

Estimated time for power to be restored

within 8 hours of it being reported to us.

Reason

Due to a faulty piece of underground network equipment we had to turn off your power.

Customers affected

-

Reference

INCD-188982-J View on map

Restored power cut
SE8 4 18 Feb 2018 22: 33 within 8 hours of it being reported to us. Due to a faulty piece of underground network equipment we had to turn off your power. - INCD-188982-J View on map TypeID_restored
Status

Restored power cut

Affected postcodes

SS1 1

Time reported

19 Feb 2018 07: 24

Estimated time for power to be restored

19 Feb 2018 between 09:00 and 10:00

Reason

A fault occurred on a piece of our electrical equipment which controls the power to your home.

Customers affected

-

Reference

INCD-1190782-A View on map

Restored power cut
SS1 1 19 Feb 2018 07: 24 19 Feb 2018 between 09:00 and 10:00 A fault occurred on a piece of our electrical equipment which controls the power to your home. - INCD-1190782-A View on map TypeID_restored
Status

Restored power cut

Affected postcodes

SS12 0, SS12 9, SS13 1, SS14 3

Time reported

17 Feb 2018 13: 40

Estimated time for power to be restored

within 8 hours of it being reported to us.

Reason

Our engineers had to redirect power due to a fault on the electricity network.

Customers affected

1

Reference

INCD-1190637-A View on map

Restored power cut
SS12 0, SS12 9, SS13 1, SS14 3 17 Feb 2018 13: 40 within 8 hours of it being reported to us. Our engineers had to redirect power due to a fault on the electricity network. 1 INCD-1190637-A View on map TypeID_restored
Status

Restored power cut

Affected postcodes

SS7 2

Time reported

27 Dec 2017 15: 07

Estimated time for power to be restored

within 8 hours of it being reported to us.

Reason

A fault occurred on an underground electricity cable affecting the local area.

Customers affected

-

Reference

INCD-1175095-A View on map

Restored power cut
SS7 2 27 Dec 2017 15: 07 within 8 hours of it being reported to us. A fault occurred on an underground electricity cable affecting the local area. - INCD-1175095-A View on map TypeID_restored
Status

Power cut

Affected postcodes

TN35 4

Time reported

19 Feb 2018 11: 04

Estimated time for power to be restored

19 Feb 2018 between 14:30 and 15:30

Reason

A fault occurred on an underground electricity cable affecting the local area.

Customers affected

-

Reference

INCD-16880-V View on map

Power cut
TN35 4 19 Feb 2018 11: 04 19 Feb 2018 between 14:30 and 15:30 A fault occurred on an underground electricity cable affecting the local area. - INCD-16880-V View on map TypeID_unplanned_power_cuts
Status

Restored power cut

Affected postcodes

W11 3

Time reported

07 Feb 2018 14: 59

Estimated time for power to be restored

within 8 hours of it being reported to us.

Reason

A fault occurred on an underground electricity cable affecting the local area.

Customers affected

-

Reference

INCD-42843-N View on map

Restored power cut
W11 3 07 Feb 2018 14: 59 within 8 hours of it being reported to us. A fault occurred on an underground electricity cable affecting the local area. - INCD-42843-N View on map TypeID_restored
Status

Restored power cut

Affected postcodes

W8 4

Time reported

19 Feb 2018 10: 45

Estimated time for power to be restored

within 8 hours of it being reported to us.

Reason

Due to a faulty piece of network equipment we had to turn off your power.

Customers affected

-

Reference

INCD-43750-N View on map

Restored power cut
W8 4 19 Feb 2018 10: 45 within 8 hours of it being reported to us. Due to a faulty piece of network equipment we had to turn off your power. - INCD-43750-N View on map TypeID_restored
Status

Restored power cut

Affected postcodes

WD19 6

Time reported

19 Feb 2018 10: 33

Estimated time for power to be restored

19 Feb 2018 between 12:30 and 13:30

Reason

A fault occurred on a piece of our electrical equipment which controls the power to your home.

Customers affected

-

Reference

INCD-19696-C View on map

Restored power cut
WD19 6 19 Feb 2018 10: 33 19 Feb 2018 between 12:30 and 13:30 A fault occurred on a piece of our electrical equipment which controls the power to your home. - INCD-19696-C View on map TypeID_restored

Is your power off?

Fill in this simple form to let us know.

Contact us

Call us 24/7 on:

0800 31 63 105 or 105

Free to call from a mobile or a landline phone

Report a power cut

Enter your postcode to begin reporting your issue. Complete the form with details of the issue and we'll log it to ensure it's looked into as soon as possible.

Get text message updates

During a power cut we can text you updates and give you an estimated time that your power will be back on.