COMMERCIAL

Increase or reduce power

If you’re working at a large commercial property or business which has an existing electricity connection (69 kVA or higher) and require additional power, we’re here to help guide you through the process.

Is this the right service for you?

You might need this service if you are:

  • Installing new equipment at a commercial property or business such as new machinery for an industrial unit
  • Dividing a building into multiple units which require separate electricity connections
  • Adding an additional floor to an existing block of flats
  • Converting the use of a premises, like converting an existing fuel station into an electric vehicle charging hub
  • Installation of low carbon technologies as part of a commercial project 

Is this the right service for you?

You might need this service if you are:

  • Installing new equipment at a commercial property or business such as new machinery for an industrial unit
  • Dividing a building into multiple units which require separate electricity connections
  • Adding an additional floor to an existing block of flats
  • Converting the use of a premises, like converting an existing fuel station into an electric vehicle charging hub
  • Installation of low carbon technologies as part of a commercial project 

Do you need to reduce your power?

If your electricity needs have reduced, you may be able to lower your agreed electricity capacity. This can help ensure your connection reflects your current requirements and avoids paying for capacity you no longer need. We'll explain what changing your capacity involves, the options available to you, and how to apply.

Do you need to reduce your power?

If your electricity needs have reduced, you may be able to lower your agreed electricity capacity. This can help ensure your connection reflects your current requirements and avoids paying for capacity you no longer need. We'll explain what changing your capacity involves, the options available to you, and how to apply.

Pre-application support

If you're not sure where to begin or if you'd like to explore your options, we offer pre-application support tools. These include our Open Data Portal, Technical Design Specifications library (G81), and Frequently Asked Questions (FAQs).

Ready to go ahead?

If you're all set and ready to proceed with the work, the next step is to use our Connections Application Portal to complete an application.

Did you know you can use an Independent Connection Provider (ICP) for various elements of the work involved in getting an electricity connection or making changes to an existing electricity connection?

Call us

Lines are open Monday to Friday, 8.30am to 5.00pm

Email us

Our team will get back to you within 5 working days

Get in touch

Download an application form

If you're unable to apply online, you can download a PDF version of the form and email it to us

Download form